SEED Guides ShaftHub Connections < >

4. Determine the operating conditions
Define the boundaries within which the connection must perform. You must ensure the selected connection is consistent with the rest of the system.

Consider at least:

The temptation of the design engineer to consider only functionality should be resisted. Time and effort expended at this stage is invariably rewarded when an optimum design is selected.